This lot is the continuation of the preliminary works for the construction of the Base Tunnel on the Italian side. Its key features are the creation of large cavities (TBM Chambers, Logistic Chamber, Ventilation Chamber), the presence of several intersections among the cavities, and above all the Exploration Gallery crossing the Periadriatic Tectonic Lineament.

  • Customer:PAC S.p.A.
  • Location:Autonomous Province of Bolzano, Mules
  • Type of service:For Construction Design
  • Period:2012 - 2014
  • Cost:€ 50.000.000

The excavations start from the south portion of the lot in the Brixen Granite with overburden of 1200 m (Mules node, Chambers, south portion of the Exploration Gallery and of the Line Tunnels) and, after crossing the Pusteria Fault (south margin of the Periadriatic Lineament, with approx. 30 m thickness), continue through the Lamella di Mules (Mules Tonalites), reaching in the final 300 m of the Exploration Gallery the tectonized rocks of the Mules Fault (north margin of the Periadriatic Lineament), made of a disorderly succession of shale carbons, tectonized paragneiss, quartzite, anhydrites with subvertical arrangement of the various portions.

To cross the tectonized areas, special excavation sections have been designed, taking into account the potential mass deformations and the development of significant loads resulting from the poor characteristics of the material and the 600-700 m high overburden.