Environmental permits

Road S.P.119 Stezzano-Spirano

Preliminary Environmental Study for the S.P.119 variant project in the Municipality of Comun Nuovo (BG)
Owner/client Pro Iter Progetto Infrastrutture Territorio S.r.l.
Type of service Environmental permits
Location Comun Nuovo (BG)
Period 2021
Cost -

Drafting of the Preliminary Environmental Study for the purposes of the Environmental Impact Assessment applicability concerning the project "Variant to SP 119 in the Municipality of Comun Nuovo" which involves the construction of a new road section intended to connect the SP n° 119 "Stezzano - Spirano" and the SP n° 120 "Grassobbio – Comun Nuovo – SS n° 42". The new road infrastructure will have the functional geometric characteristics of a secondary extra-urban road, category C, according to the standards established by the Ministerial Decree of 05/11/2001 "Geometric and functional standards for road construction"".

The activities carried out involved the preparation of the following documents:

 - Preliminary Environmental Study.

 - Predictive acoustic impact study.

 - Predictive study on emitted air pollutant fallout.

Highlights
1

Preparation of the Preliminary Environmental Study report and the supporting graphic documents.

2

Preparation of the predictive acoustic impact study for the construction and operation phases, including an acoustic measurement.

3

Preparation of the predictive study on air pollutant fallout during the construction and operation phases.