PRO ITER Progetto Infrastrutture Territorio (mandataria), Erre.Vi.A., Policreo.
The project has outlined the specifications for constructing a new bypass to serve the towns of Goito and the hamlet of Cerlongo. The design adheres to the standards set forth by current regulations for a road classified as "Type C1" under Ministerial Decree 05/11/2001. The intervention involves a roadway extending approximately 9.5 kilometers, segmented by six roundabouts that facilitate connections to local roads and the SS 236 highway.
The project also includes additional crossing and network integration works, with the most significant interventions being:
Social and Environmental Sustainability (prioritizing minimal ecological impact and promoting social benefits).
Economic Sustainability (cost-effective solutions, balancing long-term maintenance and initial investment).
Engineering Works:
• Viaduct over the Mincio River: a five-span structure with lengths of 40+64+64+64+40 meters.
• Underpass for Vehicles and Cyclists: located on Strada Pedagno, facilitating multi-modal traffic
• Viaduct over the Naviglio di Goito: single-span structure with a total length of 64 meters.